Alexander Graham Bell made the first call across the American continent in 1915, from New York to San Francisco, over copper wire strung on 130,000 poles.1 Today, this page reached you as light, flashing billions of times a second through glass so pure that a kilometer of it lets through more light than a window pane.2 Telephone networks began leaving copper behind in 1977, when the Bell System put an optical line into service in Chicago.3

Almost 50 years later, Nvidia’s NVL72, which lets 72 GPUs act as one and is among the most sophisticated computers on earth, still wires them together entirely in copper. The NVL72 is more than 5,000 cables, about two miles of them, in a rack that weighs 3,000 pounds and draws 120 kilowatts.4 The reason: use copper when you can, optics when you must. Over a meter or two, copper avoids the cost, power and failure points of turning electricity into light and back, and Nvidia estimated that optics would have added 20 kilowatts, about 17%, to that first rack.5

That rack is the scale-up domain: a group of processors joined so tightly that they work on one problem as if they were a single processor. The scale-out network, which links racks across the building, is already networked by optics. Scale-out adds more computers; scale-up makes one computer bigger. Today, copper’s reach caps that computer at about one rack.

Nvidia, Google and Huawei have already made it a priority to break that cap.

Over two decades, AI chips gained roughly 59,000 times in computing power but only 29 times in the bandwidth to talk to each other.6 Each increase in speed shortens copper’s reach, from at least three meters at 50 gigabits per lane to at least one meter at 200, and Nvidia keeps a two-meter rack inside that limit only by placing its switches in the middle.,78 Models need a bigger computer: the largest open model passes one rack’s worth of processors in 2027 on current growth, and even inside one rack a large domain has served a leading open model at a quarter of the cost per token of 8-processor servers.9

We believe that breaking that cap also breaks the existing market structure. Copper set the size of the AI computer, while optics lets anyone choose it. Once the scale-up domain can run beyond the rack, each system builder decides how many processors to join, how to join them and over which links, and those decisions are already diverging. Google joins copper cubes with optical switches, Huawei puts near-packaged optics across 4,096 processors, Amazon bridges two copper racks and AMD doubles the width of the rack.,10,11,1213 We therefore believe optical scale-up will be a market of many designs and many suppliers, of which Nvidia’s is only the first.

The market reads optical scale-up as an Nvidia story, and for the first systems it is. Nvidia targets optical links between racks in the second half of 2027 and co-packaged optics on NVLink in 2028, and it has committed $4 billion to Lumentum and Coherent to secure their laser supply.,14,1516 A supplier designed into those machines wins early volume, but Nvidia sets the specification, controls the timing and can bring the work in-house. We believe that the larger opportunity lies with the system builders who set their own designs. Each must solve the same four problems: putting optical engines beside a $40,000 processor, feeding them light while laser capacity is sold out, fitting enough bandwidth through the chip’s edge, and switching light without losing it. Three open standards are now being written, for the link, the network and the engine socket, and those decide whether independent suppliers can compete.

For investors, that combines an upgrade cycle inside a historic AI build-out with a potential reset of both who supplies it and the maximum market share any one of them can hold. Our base case is that by the end of 2030, at least two system builders other than Nvidia, Google and Huawei will deploy multi-rack optical scale-up using open standards that make designs modular and open the market to new suppliers.

Image

Networking Is the Bottleneck, Not Compute

Every AI chip computes with electricity. Inside it, billions of tiny switches called transistors turn electrical signals on and off. Nvidia’s Rubin processor holds 336 billion of them.17 Computation stays electrical, and nothing in this report changes that.

The clearest evidence comes from a company that set out to change it. Lightmatter was founded out of MIT in 2017 to build a processor that computes with light. The problem wasn’t that it couldn’t demonstrate photonic computing. In fact, Lightmatter has shown a light-based processor running real AI models.18 The problem is that breakthroughs in computing aren’t what matters.

When massive transformer models get split between tens to thousands of processors, they become interconnect bound: their output speed is limited not by the speed of the processor, but by how fast data can reach it.19 That’s the job of networking. Lightmatter started focusing on an optical interconnect, Passage, to move data between chips. That’s what propelled it to a $4.4 billion valuation.20

Lightmatter’s experience is the whole industry’s in miniature. Over the past two decades, the peak computing power of AI hardware has grown about 3x every two years, while the bandwidth of the connections between chips has grown about 1.4x.21 Compounded over those twenty years, 3.0 to the tenth power is roughly a 59,000-fold increase in computing power, against 1.4 to the tenth power, roughly 29-fold, for interconnect.

59,000×increase in AI computing power over two decades
29×increase in interconnect bandwidth over the same period

Today, Nvidia’s newest processor, Rubin, can do 50 quadrillion calculations a second at the low precision used to run AI models. It can read from its own memory at 22 terabytes per second. Its scale-up link to the other processors in its rack peaks at 1.8 terabytes per second in each direction, about a twelfth of what it reads from its own memory, and its connection to the rest of the cluster carries about 0.2 terabytes per second.22 Each generation, processors can do more work than their links can feed, and they spend more of their time waiting for data. The fix is not a faster processor. It is a better network.

Image

Light can compute but that’s not where the bottleneck is. The processor is going to stay electrical, and the copper-versus-optics debate is entirely about networking: how processors talk to each other.

At Faster Speeds, Copper’s Limits Are Exposed

Closing that gap means moving more data between chips every second. That is exactly where copper, the default inside every rack for good reason, starts to break: the faster a copper link runs, the shorter the distance it can reach.

Every message that leaves a chip has to travel as either electricity over copper or light through glass. However, light needs extra hardware at both ends of every link: a transmitter to convert electrical signal into light, and a receiver to convert it back, which has costs in both power and reliability. Depending on the signal-processing design, 1.6-terabit (current state of the art) pluggable modules draw 10–30 watts each.23

Like a currency conversion, converting an electrical signal into light has a cost. The journey needs to justify it, which the short distances inside a datacenter rack generally don’t.

Image

The problem is that faster signals do not travel as far through copper. As the signal speeds up (higher frequency), resistance rises, more signal is lost and ultimately the receiver can no longer tell a one from a zero.

On the Ethernet standard, a copper wire pair targets distances of at least 3 meters at speeds of 50 gigabits per second (“50G”). That falls to at least 2 meters at 100G and at least 1 meter at 200G. By contrast, optical fiber can reach 2 kilometers at 200G.24

In fairness, an IEEE project approved in September 2026 does target at least one meter of passive copper reach at 400 gigabits per lane, but it is not commercially proven.25

Image

Copper can be pushed further by adding chips along the cable that clean up and boost the signal. Credo sells these active electrical cables at up to 7 meters for 100-gigabit lanes, enough to reach a neighboring rack.26 But each adds power, cost and latency, the delay before data arrives, and each speed step makes them harder to build.

So why do all these different speeds matter?

How fast, and when

Equipment gets its headline speed by running many lanes side by side, so an optical module with eight lanes at 200G carries 8 × 200 = 1,600 gigabits, or 1.6 terabits, per second. There are two ways to go faster: add more lanes, or make each lane faster. More lanes need more wires, connectors and space at the edge of the chip, all of which are scarce. So the industry’s main lever is lane speed, which is exactly what we see shortening copper’s reach above.

Today the leading lane speed is 200G. InnoLight and Eoptolink report volume production of 1.6-terabit optical modules at 8 × 200G.27 Our calculations suggest that Nvidia’s NVL72 runs 200G lanes.28

The next step is already in the lab where Coherent demonstrated a 3.2-terabit module, eight lanes at about 400G each, and InnoLight expects 3.2-terabit modules to ramp from 2028.29 Nvidia and Cisco also announced USFP, a new pluggable module format designed for 400 gigabits per electrical lane.30

So the issue is clear: the industry is racing to increase lane speeds, but we’ve already reached 200G, where copper’s one-meter reach only networks a two-meter-tall rack by placing the switch in the middle. At 400G, the ability to do the same is still unproven.

Image

Copper figures are standard minimums for passive cable and vendor claims for active cable.31

Glass barely weakens light, so distance is effectively free. A single fiber can also carry several independent streams at once on different wavelengths as different colors (wavelength division multiplexing). Adding colors raises capacity without making any single stream run faster.

Intel’s 2024 optical input/output prototype shows what that looks like at chip scale: one chiplet carrying about four terabits per second in both directions combined, 2.5 times a 1.6-terabit pluggable, at a third of the energy per bit, with a design reach of up to 100 meters. Intel cautioned that the time light takes to travel could limit practical use to tens of meters.32 That is still far enough to join racks, at lane speeds where copper struggles to cross one.

As bandwidth rises, copper’s reach shrinks, while distance costs light almost nothing. That rule explains why one of the datacenter’s two networks moved to light years ago, and the other has not.

The Opportunity Is in Scale-Up

Image

Scale-out: already light

Scale-out connects racks to each other across the building, linking thousands of processors into one cluster. During training, scale-out lets copies of a model in different racks combine what each has learned after every step (their gradients). During inference, model replicas generally sit within one rack, and the scale-out fabric can be used to route requests between them (load-balancing).

Those links run from tens of meters to kilometers, far beyond copper’s reach at any modern speed. So scale-out moved to light years ago. Today, each link ends in a pluggable transceiver, a removable module at the front of a server or switch that converts electrical signals into light.

Image

This is where today’s optical revenue comes from, and it is growing fast. Lumentum reported fiscal 2026 revenue of $3.01 billion, up 83.2%.33 Coherent’s datacenter and communications business generated $5.28 billion in fiscal 2026, against $3.76 billion a year earlier.34 Tower Semiconductor announced $1.3 billion of silicon-photonics revenue contracts for 2027, backed by $290 million of customer prepayments.35 Tower pitches the platform at today’s pluggable modules as well as designs that bring optics closer to the processor.

Scale-out is a good business, but it isn’t the reason for this report. The technology works, customers buy it in volume, and the suppliers are established public companies. Its growth is mostly a question of how many datacenters get built.

Image

Scale-up: still copper

Scale-up is the network “inside the machine.” It joins a group of processors so tightly that they work on one problem as if they were a single large processor, exchanging intermediate results continuously at very high speed. Its most common use is at inference time, where a large model is split across accelerators to pool memory and serve users at low latency.

Because scale-up happens inside one rack, with processors within a meter or two of each other, copper can network every chip together, and so it does. Optics within one rack would add unnecessary power draw and failure points such as lasers and conversion parts.

Copper and the one-rack domain have held each other in place. Copper’s reach capped the domain at one rack, and while models fit inside it, the industry, with a few exceptions, had no reason to pay for optics to go further. That reason arrives when the models outgrow the rack.

Optics Lets the Computer Grow Beyond the Rack

The models are outgrowing the rack

Moonshot AI’s Kimi K2, an open model, has a trillion parameters.36 Served at 8-bit (FP8) precision, that needs 1 TB of memory, plus room for each user’s context (the KV cache). One Nvidia Rubin GPU offers 288 GB of memory, so scaling these models beyond one GPU is a requirement.37 Soon that requirement will extend past an entire rack of 72 GPUs, and the scale-up domain will have to grow beyond what copper allows.

Image

We model the required scale-up domain to host a model and its KV cache at an acceptable cost and user speed. To simplify the mechanics: when the domain is too small, most of each GPU’s memory goes to the model’s weights, leaving little room for users’ conversations, so each GPU serves fewer users at the same speed, and the cost per token rises.

Today, Kimi K3, the largest open model, is served at acceptable cost and speed only on 69 Rubin GPUs, just inside one rack. It could run on eight GPUs, but at about six times the cost per token.

If parameter counts keep doubling every two years, Kimi’s efficient copy passes one rack in 2027, and DeepSeek’s and GLM’s in 2029. By 2030, squeezing Kimi into a single rack would cost 67% more per token.

A bigger domain makes tokens cheaper, where it matters

SemiAnalysis’s InferenceX benchmark ran DeepSeek-R1 on the same Blackwell chip in two configurations: a GB200 NVL72 rack, where the model is spread across 32 GPUs on one NVLink domain, and B200 servers, where NVLink stops at eight GPUs and everything beyond travels over Ethernet. At 125 tokens a second per user, the rack produced 4.4 times as many tokens per second per GPU as the eight-GPU servers.38

When the cost of the hardware is fixed, producing more tokens reduces the effective cost of serving one. Even after paying 13% more per GPU-hour for the rack, cost per million tokens fell from $0.58 to $0.15.39 The bigger domain substantially reduces the cost of serving tokens.

4.4×more tokens per second per GPU on a full NVL72 rack vs. 8-GPU servers (at 125 tokens/sec per user)
$0.15cost per million tokens on the NVL72 rack, vs. $0.58 on 8-GPU servers

The advantage has a sweet spot, and 125 tokens a second per user is its peak, the middle of the speed curve. At slow speeds, batches are large enough that arithmetic, not memory, limits each processor, so bigger domains don’t matter. At the fastest speeds, the network’s latency caps speed whatever the size of the domain. In between, reading the weights takes a large share of each step, and spreading them over more processors pays off.

That middle band is also where commercial AI is served, so the value of bigger scale-up domains matches commercial reality. On Artificial Analysis’s leaderboard, the leading APIs stream answers at roughly 75 to 115 tokens a second.40

And the network latency that caps the benefits of scale-up is mostly a product of today’s technology, not physics. When many GPUs need to sync their results, the software that schedules, transfers and synchronizes the work becomes a real lever. Better software that balances the load more efficiently could bring that latency closer to physical limits, and let scale-up domains reach speeds (and costs) that single servers cannot.

To size that opportunity, we built a simple model of a single generation step.41 In every step, each processor re-reads its share of the model’s weights before it can serve any user, and every exchange between processors adds a fixed wait. Spreading the weights over more processors frees time for users, while the waits cap how fast any domain can go.

We keep latency per exchange fixed at all domain sizes, so this is a purely theoretical case.42 If that overhead stays flat, a bigger domain shifts the curve outward: it can serve a larger model at the same speed, or the same model faster. Going from one rack to eight takes Kimi K3 from 99 tokens a second to 330. Holding speed at 250 tokens a second instead, the largest model the domain can serve rises from about 1 trillion parameters to 4 trillion.

Image

A bigger domain buys a larger model or a faster answer, but only if latency stops growing with scale.

Copper caps domain size

Growing the domain is becoming necessary to drive AI forward, and copper is turning into a bottleneck. Its reach is set by physics: at the 200G-and-faster lane speeds that modern AI requires, passive copper reaches about one meter, and active cables a few meters. Marvell’s chief executive, Matt Murphy, says that at 400G “we can no longer fully connect the rack with copper.”43

Distance matters because a large domain is physically large. An AI rack is about 60 centimeters wide.44 A domain of 576 processors built from 72-processor racks needs eight of them, a row almost five meters long. Cables cannot cross that row in a straight line: they rise out of one rack, run along the top of the row and drop into a switch in another, so a link from the end of the row to its middle covers several meters.

That is why the copper domains that cross a rack stop at two, and each needs a workaround. Amazon’s Trainium3 joins 144 chips across two racks over copper, but the links between the racks carry less than a tenth of the bandwidth of those inside.45 The result is two tightly coupled halves joined by a narrow bridge, not one uniform domain. AMD built its Helios rack at twice the standard width. AMD cites weight and serviceability, but a reasonable read is that the extra width also keeps every copper run short enough to carry 3.6 terabytes per second per processor.46 Nvidia planned a two-rack copper version of its Rubin system, then, according to SemiAnalysis, scrapped it after cloud providers objected to its “odd design and heavy operational burden.”47

The alternative is to pack more processors into one rack, which is Nvidia’s plan for Kyber: 144 GPUs in a single rack, with their cables replaced by one circuit board running through its middle. But according to SemiAnalysis, that circuit board is so hard to make without defects that Kyber has slipped more than a year, to 2028.48

Stretching copper across racks burdens the operator, and packing it tighter is running into the limits of circuit-board manufacturing. Neither is sustainable for the multi-rack domains of 500 or more GPUs, so everyone who has built one uses light.

Google has run optical scale-up since TPU v4 entered service in 2020.49 Inside each rack, copper wires 64 chips together in a 4×4×4 cube. Only the links that leave the cube are converted to light, by optical transceivers on its six outer faces: 96 per cube, an average of 1.5 per chip. Those fibers let each cube reach cubes far across the building, and in the current Ironwood generation 144 cubes join into one machine of 9,216 chips.50

The cubes are joined by optical circuit switches (OCS). Unlike conventional network switches, which convert incoming light to electricity and back for processing, OCS steers light from one fiber to another with tiny movable mirrors, connecting the right cubes without optical-electrical conversion. A message is converted once as it leaves one cube and once as it enters another. The result is that Ironwood hits two-thirds of the bandwidth per chip of NVL72, but the domain is 128x larger.

Image

Nvidia’s 576-processor design joins eight 72-processor racks with “copper and direct optical connections,” and its 1,152-processor Kyber system uses “direct optical interconnects for rack-to-rack scale-up.”51 In March 2026 Nvidia committed $2 billion each to Lumentum and Coherent, $4 billion in total, alongside multibillion-dollar purchase commitments and rights to future laser capacity.,5253

Multi-rack domains of 576 or more GPUs will use optics. The open question is how.

Google’s optical links cost ten times their copper counterparts.54 Nvidia’s Blackwell-generation design for a 576-processor machine used pluggables, which SemiAnalysis said made it “untenable from a TCO perspective.”55 Google designed its entire system from scratch around optics, and found that optics made up less than 5% of system cost.56 The cost of optics can therefore be workable for an operator able to redesign the whole system end to end. For everyone else, the switch to optics still brings many unsolved problems, cost being just one.

The Problems That Decide Who Gets Designed In

Image

Move the optics onto the package

Every optical link today begins with a short electrical journey. The signal leaves the processor or switch chip, crosses a circuit board to a pluggable module at the front of the box, and only then becomes light. At 200 gigabits per lane that short trip degrades the signal enough that the module needs a digital signal processor, or DSP, to clean it up, which is why a fully retimed 1.6-terabit pluggable draws 25 to 30 watts, against 10 to 13 for linear designs that drop the DSP.57 The fix is to shorten the electrical path. Near-packaged optics, or NPO, places the optical engine, the chip that converts electricity into light and back, on the board right beside the processor. Co-packaged optics, or CPO, puts it inside the processor’s own package.

Image

At the switch, this already works. In lab testing at Meta, Broadcom’s CPO switches used 65% less power for their optics than pluggable modules and logged a million port-hours without a link dropping, and Nvidia says its CPO Ethernet switches are in production.,5859 That reduction in power draw, and stripping out components like the DSP, is what takes TCO from “untenable” under pluggables to workable under CPO, and it is what the whole industry is racing toward.

But the accelerator is a harder job than the switch. It is the most expensive part in the rack, $30,000 to $40,000 for a Blackwell GPU.60 Once an optical engine is built into that package, a fault in optics that today sit in a pluggable module costing about $1,000 can mean replacing the whole processor.61 Those components are known to fail often. Near-packaged optics is the middle step that does not sacrifice the whole package to an optical fault.

Huawei’s Atlas 960E pod uses NPO. Available in Q3 2027, it will use 5,500 near-packaged engines in place of 48,000 800G pluggables, saving 550 kW, equivalent to 500 average homes and doubling the time the system runs without a fault.,6263 Huawei published no cost, and its own engineers told ECOC that pluggables will remain dominant at 200 gigabits per lane.64

Most of the private capital in optics is focused here, with the key question being which problem to solve first.

The first is failure: a domain of thousands of processors across dozens of racks turns a rare link fault into a constant condition. Lasers are the part most likely to fail so Ayar Labs keeps them out of the package. Ayar’s TeraPHY chiplet sits beside the processor and draws light from a separate, replaceable laser module.65 CScale, which left stealth in September 2026 backed by Nvidia and Intel, takes the opposite route. It integrates lasers onto the chip and designs the link so that a failed laser does not stop data or compute.66 Whichever approach works, the supplier that makes a laser failure routine removes the strongest objection to putting optics on a $40,000 GPU.

The second difficulty is space. A chip can only send signals off from its edges, and that edge is also where its high-bandwidth memory connects, so every millimeter given to optics is taken from memory. Lightmatter’s Passage places the optical layer underneath the chips as an interposer, a base layer that connects everything in the package, with 114 terabits per second of bandwidth on its reference platform.67 Celestial AI’s Photonic Fabric takes its optical connections from inside the chip’s footprint rather than its edge, 16 terabits per second per chiplet, which frees that edge for more memory.68 Marvell also lists pooled memory among the fabric’s future uses and guides to a $500 million annual run rate from Celestial’s technology by the end of its fiscal 2028.,6970 Volantis connects compute to memory over light.

Lumilens is also building for NPO and CPO, but today earns its revenue from traditional pluggables, where its pitch is manufacturing: automated assembly that it says can be replicated in any region, which matters while US regulators weigh barring Chinese transceivers, the source of much of today’s supply.,7172

The core complication is that the buyers of co-packaged optics become the handful of companies that design accelerators, and the largest of them build their own optics anyway. Broadcom designs its own CPO, Nvidia develops its optics with TSMC and its own suppliers, Marvell bought Celestial and AMD bought Enosemi.,73,7475 But NPO will arrive before CPO, because it keeps parts replaceable, and that is the opening for independents. Open CPX defines common sockets for near-packaged engines, which would let any optical vendor compete for the same socket, but would also make any moat in NPO thin.76

Feed it light

Silicon cannot make light, so every optical engine needs a laser, usually made of indium phosphide. Consensus is that co-packaging moves the laser into a separate module that can be swapped, because it is the part most likely to fail. A minority, including CScale and Scintil Photonics, is betting that lasers built into the chip will win instead.,7778

The public incumbents are winning it, but the reason is capacity rather than technology. Lumentum and Coherent already supply the high-power lasers these modules use, and both are short of the indium phosphide wafer capacity to make more. Coherent’s chief executive calls the ramp of indium phosphide production “the primary constraint” and says its fiscal 2027 is “basically completely booked out”; Lumentum says its Japanese laser fab is “fully allocated.”,7980 New laser capacity takes years to build and qualify, which is why Nvidia paid $2 billion into each company for rights to future supply.,8182

The private companies are interesting because co-packaging asks for a different kind of light source. To carry more data through the few fibers that fit at a chip’s edge, one source has to produce many wavelengths at once. Xscape Photonics puts eight wavelengths and more than a watt of power into one replaceable module. Quintessent produces eight wavelengths from a single quantum-dot laser built on gallium arsenide, which also sidesteps the indium phosphide shortage. Scintil builds its lasers directly onto silicon photonic chips, manufactured at Tower Semiconductor.

More wavelengths alone will not set the private companies apart, because Lumentum plans its own eight-wavelength module for the first half of 2027.83 What the incumbents cannot easily offer is a laser that does not depend on the indium phosphide capacity they are short of. Quintessent’s lasers are grown on gallium arsenide, and Scintil builds its lasers into silicon chips on a foundry line at Tower rather than as separate indium phosphide chips. While laser supply remains the bottleneck, that independence is a stronger argument for the private companies than any gain in performance.

Go wide, not just fast

The consensus way to get more data off a chip is to run each lane faster, the step from 200 to 400 gigabits per lane set out earlier. To make this work, a laser produces a steady beam, and a modulator writes data onto it by switching the light hundreds of billions of times a second. A faster lane needs a faster modulator.

The incumbents build modulators in one of two materials. Silicon modulators come out of ordinary chip factories cheaply and at volume, but need a separate laser, because silicon cannot make light. Indium phosphide can make the light and modulate it on the same chip, but on smaller, more expensive wafers. Both are reaching the speeds required by the next step up in networking. Tower Semiconductor and Coherent have shown a plain silicon modulator at 420 gigabits per lane, and Coherent’s 3.2-terabit demonstration module runs on its own indium phosphide lasers with the modulator built in.84 Silicon modulators also need several volts to switch, which takes a separate driver chip and the power it draws; indium phosphide needs far less.85

New materials aim to close that gap. HyperLight’s thin-film lithium niobate matches the voltage advantages of indium phosphide on larger, cheaper wafers. Its 400G parts are sampling, and it has signed UMC for volume production.86 Polaris Electro-Optics adds its material to standard silicon wafers and claims 400 gigabits per lane at under a volt, which would beat indium phosphide while keeping silicon’s manufacturing advantage.87 Inpho’s bet is integration, putting the electronics that drive the modulator onto the same chip, which it says maximizes speed per unit of chip edge.88

Running four or eight ever-faster lanes in an optical module is the fast-and-narrow approach. Optical scale-up could instead go wide and slow.

Fast, narrow lanes come from telecom, where fiber between cities is expensive to lay, so each strand is made to carry as much as possible. Speed is expensive: past a point, each lane needs a DSP to recover a clean signal, and the DSP draws power. Slow the signal down and it arrives clean enough to read directly, with no DSP and from cheaper light sources. In the datacenter, links are short and run above ground, and power is the scarce resource, so the design should change with it.

The OCI agreement, founded by AMD, Broadcom, Meta, Microsoft, Nvidia and OpenAI specifically for scale-up, starts at four wavelengths of 50 gigabits each, using the simplest on-off signaling to meet the low power targets of copper.89 Similarly, Microsoft’s MOSAIC prototype runs 100 slow channels from microLEDs and claims up to 68% less power, 50 meters of reach and 100 times the reliability of conventional optics.90 These are two versions of one idea: OCI uses a few slow wavelengths on ordinary fiber, while MOSAIC uses 100 slow channels on new kinds of fiber. Credo aims to ship a cable built on the same principle in 2027, initially for scale-out networks, and Lumentum, Qualcomm and Corning have shown roughly 1 Tb/s from each millimeter of chip edge using small, cheap lasers called VCSELs.,9192

Image

Wide and slow packs more bandwidth into the chip’s edge, removes the DSP, and microLEDs and VCSELs don’t bring the supply constraints that indium phosphide does. Avicena has shipped 1 Tb/s microLED evaluation kits that use no lasers at all.93 Some of these projects still feel like science projects, but due to constraints like indium phosphide capacity and laser reliability, we believe that the industry will drive their success.

Make optical switching scalable

Outside Google, today’s scale-up domains use electrical switches, which convert every incoming signal from light to electricity and back. An optical switch skips those conversions and is “data rate and wavelength agnostic, low latency, and extremely energy efficient,” so it saves the transceivers at the switch and survives the next step up in lane speed without being replaced.94

The incumbents sell the mirror switches Google pioneered (yes, they literally steer light with tiny mirrors), and that market is growing fast. Lumentum earned more than $90 million from optical circuit switches in fiscal 2026, and more than $108 million in the first quarter of fiscal 2027 alone. Coherent had shipped its own to seven customers by November 2025 and offers a 64-port model.,9596

But today’s optical switches take milliseconds to reconfigure, they hold a fixed connection rather than reading each message, they are the size of a server, and every one of them loses some of the light passing through, which helps to explain why no one has followed Google yet.

Of these four blockers, loss decides how big the domain can get. A standard short-reach link tolerates only about three decibels (dB) of loss end to end, roughly half its light.97 Each switch joins as many chips as its port count allows, so increasing the domain size needs layers of switches, and every layer the signal crosses compounds loss. A lossy switch therefore caps the number of layers, and with it the size of the domain.

Silicon photonics-based switches, which don’t use tiny mirrors, are the small, fast kind a larger domain needs, but they have historically been the lossy kind.98 To eliminate that loss, Salience Labs amplifies the light on the chip itself. Its 32-port switch is ramping in production, it has shown a 64-port version, and it plans 128 and 256 ports.99 Salience quotes under 2 dB of loss at 32 ports, which would effectively solve the loss that has plagued silicon switches and it reconfigures in under 300 microseconds, against milliseconds for mirror-based switches.100 nEye tackles the problem by building microscopic mirrors into silicon chips and iPronics sells a rack-mounted programmable switch, but no loss disclosure.,101102 Oriole Networks avoids layers altogether, sending every signal through a single passive glass hop and doing the switching with fast-tuning lasers.103

What we leave to the incumbents

The last problem, building all of this at volume, is left to the incumbents. Testing each engine before it is bonded, and attaching hundreds of fibers to it, are real bottlenecks, but the companies solving them are being bought rather than built: Molex acquired Teramount, whose detachable fiber connector makes engines serviceable and replaceable in the field, and GlobalFoundries bought the Singapore photonics foundry AMF.104 We see little room there for a new independent supplier; among incumbents, Teradyne is likely to be a major beneficiary of the testing bottleneck.

When the Market Opens Up

Nvidia is the first route to market and the largest single prize, but also the narrowest. It is adding optics to a system it has always designed end to end, and its 2027 and 2028 targets mean the parts for those machines are being chosen now.

A supplier that co-designs the optics for Nvidia’s multi-rack machines wins early volume, learns the system alongside its owner and, once co-packaged, becomes hard to replace. But most of those slots will go to partners Nvidia already has, and Nvidia is a customer that sets the specification, controls the timing and can bring the work in-house.

The larger opportunity is everyone else where each system builder decides how large its domain should be and how to join it, and the designs described above already differ. Google joins copper cubes with optical switches, Huawei puts near-packaged optics across 4,096 processors, Amazon bridges two copper racks, AMD doubles the width of the rack, Arista has designed an Ethernet domain of 1,024 accelerators across racks, and Microsoft has prototyped hundreds of slow channels.105

Each design needs a different mix of engines, light sources, links and switches. These builders are also a growing share of the market, and the growth is led by inference. Servers built on custom ASICs are expected to reach 27.8% of AI server shipments in 2026 as Google and Meta expand their own chips, and Amazon says Bedrock, its main inference service, runs most of its inference on Trainium.,106107 Shipment counts understate that share, because most ASICs are consumed internally.

Hardware markets of this kind are rarely winner-takes-all. In scale-out, the pluggable module’s shape and interface were standardized and in 2025 the largest transceiver supplier took about $5.3 billion of a $23.8 billion market, under 25%.108

The same interfaces are now being written for scale-up. OCI specifies the optical link, ESUN the Ethernet network that runs over it, and Open CPX a common socket for near-packaged engines.,109,110111 They matter because the largest system builders make their own optics, as Broadcom does, and as Marvell and AMD now do through Celestial and Enosemi.,112113 A shared interface lets an independent engine compete with its customer’s in-house team without the customer redesigning its chip. It also thins any advantage built on the interface itself, so surviving as a supplier will be based on maintaining constant performance, supply or manufacturing advantages.

Image

Systems in operation, vendor availability and company targets; none is a measure of deployed volume.,114,115,116,117,118,119120

Nvidia’s suppliers for its first optical scale-up systems are being chosen in 2026 and 2027. The open builders follow, and our base case is that by the end of 2030 at least two system builders other than Nvidia, Google and Huawei will deploy multi-rack optical scale-up using open standards that make designs modular and open the market to new suppliers. An independent that misses Nvidia’s first design cycle has not missed the market, only one machine among many.

The Computer Beyond the Rack

The telephone network kept its copper until the demands on the wire outgrew it, and then moved to glass wherever distance made light the cheaper way to carry a signal. The AI computer is reaching the same point. Until now its size has been set by how far a copper cable can run at full speed, and that reach is falling short of the machine the largest models need. Once light carries the scale-up network beyond the rack, the size of the computer stops being a physical limit and becomes a decision each builder makes for itself: how many processors, joined how, and over which links. Those decisions will not all come out the same, and each one is a place for a supplier to be chosen.

So where will the winners come from? The largest single prize is a design-in at Nvidia. A supplier inside its first optical machines rides the volume of the industry’s largest player. Once its part is co-packaged into the processor, replacing it means redesigning the package, so it is hard to dislodge. The catch is that the slots are few, and Nvidia has a long record of bringing key parts in-house, as it did with networking when it bought Mellanox. The broader opportunity lies with the system builders who choose their own domains: Amazon, Meta, Microsoft, AMD and Arista and the parts that they need to make optical scale-up work.

Footnotes

  1. Stephen Lawson, Computerworld, This 1915 Conference Call Made History, 2015; AT&T, Transcontinental Telephone Line Historical Marker, West Wendover, Nevada, transcribed by the Historical Marker Database, accessed 2026. ↩

  2. Corning, SMF-28 Ultra Optical Fiber Product Information, 2024; Pilkington, Pilkington Optifloat Clear, accessed 2026; Activant Analysis, 2026: maximum attenuation of 0.18 dB/km at 1550 nm passes about 96% of light over one kilometer (10^−0.018), against 91% light transmittance for clear float glass. The fiber figure is for the infrared wavelength it carries, the glass figure for visible light. ↩

  3. Nokia Bell Labs, Our History, accessed 2026. ↩

  4. Nvidia, NVIDIA Contributes NVIDIA GB200 NVL72 Designs to Open Compute Project, 2024; Nvidia, GTC 2024 Keynote, 2024. Cable length, rack weight and rack power are Jensen Huang’s statements in the keynote, quoted from an independent transcript. ↩

  5. Nvidia, GTC 2024 Keynote, 2024. Jensen Huang’s rack-level comparison, quoted from an independent transcript. ↩

  6. Amir Gholami et al., AI and Memory Wall, IEEE Micro, 2024; Activant Analysis, 2026: ten two-year periods at 3.0x and 1.4x give 3.0^10 ≈ 59,000 and 1.4^10 ≈ 29. ↩

  7. IEEE P802.3cd Task Force, 50 Gb/s Ethernet over a Single Lane: Objectives, 2016; IEEE P802.3ck Task Force, 100 Gb/s per Electrical Lane: Objectives, 2018; IEEE P802.3dj Task Force, Adopted Objectives, 2024. Reach figures are standard objectives for passive copper twin-axial cable and single-mode fiber, stated as minimums (“at least”). ↩

  8. Nvidia, NVIDIA Contributes NVIDIA GB200 NVL72 Designs to Open Compute Project, 2024; Nvidia, GTC 2024 Keynote, 2024. Cable length, rack weight and rack power are Jensen Huang’s statements in the keynote, quoted from an independent transcript. ↩

  9. SemiAnalysis, GB200 NVL72 vs B200 on DeepSeek R1 670B: Up to 4.4x Throughput per GPU at 125 tok/s/user, 2026. Independent benchmark at FP4 with 1,000-token inputs and outputs, disaggregated prefill and decode on Dynamo TRT-LLM; the 125 tokens/s figures are SemiAnalysis’s interpolation between measured points. Costs use SemiAnalysis’s TCO of $2.21 per GPU-hour for GB200 NVL72 and $1.95 for B200. ↩

  10. Amin Vahdat and Mark Lohmeyer, Google Cloud, Announcing Ironwood TPUs General Availability and New Axion VMs to Power the Age of Inference, 2025; Pankaj Makhija, Google, TPU Rack Overview, Hot Chips 2025 tutorial, 2025. ↩

  11. Huawei, Huawei Launches the World’s First NPO-based SuperPoD, the Atlas 960E SuperPoD, 2026. Vendor claims, not independent evidence of deployment. ↩

  12. SemiAnalysis, AWS Trainium3 Deep Dive, 2025; Amazon Web Services, Announcing Amazon EC2 Trn3 UltraServers for Faster, Lower-Cost Generative AI Training, 2025. The cross-rack bandwidth share is SemiAnalysis’s figure, not Amazon’s. ↩

  13. AMD, AMD Helios: AI Rack Built on Meta’s 2025 OCP Design, 2025; AMD, AMD Helios, 2026; Activant Analysis, 2026: 260 TB/s aggregate scale-up bandwidth ÷ 72 GPUs ≈ 3.6 TB/s per GPU. ↩

  14. Nvidia, GTC 2025 Announcements and Live Updates, 2025; Nvidia, Vera Rubin POD: Seven Chips, Five Rack-Scale Systems, One AI Supercomputer, 2026; Alex Woodie, HPCwire, Huang Shares Nvidia Roadmap Showing More Chips, NVL1152, Scale-Up CPO, 2026. Company roadmap targets; the 2028 NVLink 8 CPO date is cited from coverage of the GTC 2026 keynote slide. ↩

  15. Nvidia, NVIDIA Announces Strategic Partnership With Lumentum to Develop State-of-the-Art Optics Technology, 2026. ↩

  16. Nvidia, NVIDIA and Coherent Announce Strategic Partnership to Develop Optics Technology to Scale Next-Generation Data Center Architecture, 2026. ↩

  17. Nvidia, Inside NVIDIA Rubin GPU Architecture, 2026. ↩

  18. Sufi R. Ahmed et al., Universal Photonic Artificial Intelligence Acceleration, Nature, 2025. Lightmatter-authored research; the processor ran ResNet, BERT and an Atari deep reinforcement learning agent. ↩

  19. Sally Ward-Foxton, Lightmatter CEO: AI’s Next Scaling Challenge Is Interconnect, Not Compute, EE Times, 2026. ↩

  20. Lightmatter, Lightmatter Raises $400M Series D; Quadruples Valuation to $4.4B as Photonics Leader for Next-Gen AI Data Centers, 2024. ↩

  21. Amir Gholami et al., AI and Memory Wall, IEEE Micro, 2024; Activant Analysis, 2026: ten two-year periods at 3.0x and 1.4x give 3.0^10 ≈ 59,000 and 1.4^10 ≈ 29. ↩

  22. Nvidia, Inside the NVIDIA Vera Rubin Platform: Six New Chips, One AI Supercomputer, 2026; Activant Analysis, 2026. NVLink 6 is rated at 3.6 TB/s counting both directions, halved here to 1.8 TB/s per direction; ConnectX-9 is rated at 1.6 Tb/s per direction, or 0.2 TB/s. All are peak capacity, not measured traffic. ↩

  23. Credo, ECOC 2026 Market Focus Presentation, 2026, slide 4. Vendor estimates at 1.6 Tb/s; power varies by signal-processing architecture. ↩

  24. IEEE P802.3cd Task Force, 50 Gb/s Ethernet over a Single Lane: Objectives, 2016; IEEE P802.3ck Task Force, 100 Gb/s per Electrical Lane: Objectives, 2018; IEEE P802.3dj Task Force, Adopted Objectives, 2024. Reach figures are standard objectives for passive copper twin-axial cable and single-mode fiber, stated as minimums (“at least”). ↩

  25. IEEE 802.3 400 Gb/s per Lane Study Group, 400GPL Objectives, 2026; IEEE 802.3, P802.3dv Project Approval, 2026. An objective for passive twin-axial cable, not an achieved product specification. ↩

  26. Credo, ZeroFlap HiWire SPAN 800G Active Electrical Cable Product Brief, 2025. Vendor specification. ↩

  27. Broadcom, Broadcom Now Shipping the World’s First 102.4 Tbps Switch in Production Volume, 2026; InnoLight, 2026 Interim Report, 2026; Eoptolink, 2026 Interim Report, 2026. ↩

  28. Nvidia, NVIDIA Contributes NVIDIA GB200 NVL72 Designs to Open Compute Project, 2024; Nvidia, GTC 2024 Keynote, 2024. Cable length, rack weight and rack power are Jensen Huang’s statements in the keynote, quoted from an independent transcript. ↩

  29. Coherent, Coherent Showcases Optical Innovations to Scale AI Infrastructure at ECOC 2026, 2026; InnoLight, 2025 Annual Report, 2026. ↩

  30. Nvidia and Cisco, NVIDIA and Cisco Introduce New Pluggable Optics Form Factor to Scale AI Factories, 2026. ↩

  31. Lumentum, Q4 Fiscal 2026 Earnings Call, 2026; Broadcom, Broadcom Delivers Industry’s First 400G/Lane Optical DSP for Next-Generation AI Networks, 2026; Marvell, Alaska A 1.6T PAM4 DSP Product Brief, 2024. Passive-copper minimums are from the IEEE sources at notes 7 and 24; active-cable reach at 200 gigabits per lane is Marvell’s claim; the Lumentum transcript is independent. ↩

  32. Intel, Intel Demonstrates First Fully Integrated Optical I/O Chiplet, 2024. A prototype: 64 channels of 32 Gb/s in each direction over eight fiber pairs of eight wavelengths, at 5 pJ per bit against about 15 pJ per bit for pluggable modules. Activant Analysis, 2026: 4 Tb/s ÷ 1.6 Tb/s = 2.5. ↩

  33. Lumentum, Fourth Quarter and Full Fiscal Year 2026 Results, 2026. ↩

  34. Coherent, Form 10-K for the Fiscal Year Ended June 30, 2026, 2026. ↩

  35. Tower Semiconductor, Tower Semiconductor Signs Customer Contracts for $1.3 Billion Silicon Photonics Revenue for 2027, 2026. ↩

  36. DeepSeek-AI, DeepSeek-V3 Technical Report, 2024; Moonshot AI, Kimi K2 Model Card, 2025. ↩

  37. Nvidia, Vera Rubin POD: Seven Chips, Five Rack-Scale Systems, One AI Supercomputer, 2026; Nvidia, NVIDIA Vera Rubin NVL72, 2026. ↩

  38. SemiAnalysis, GB200 NVL72 vs B200 on DeepSeek R1 670B: Up to 4.4x Throughput per GPU at 125 tok/s/user, 2026. Independent benchmark at FP4 with 1,000-token inputs and outputs, disaggregated prefill and decode on Dynamo TRT-LLM; the 125 tokens/s figures are SemiAnalysis’s interpolation between measured points. Costs use SemiAnalysis’s TCO of $2.21 per GPU-hour for GB200 NVL72 and $1.95 for B200. ↩

  39. SemiAnalysis, GB200 NVL72 vs B200 on DeepSeek R1 670B: Up to 4.4x Throughput per GPU at 125 tok/s/user, 2026. Independent benchmark at FP4 with 1,000-token inputs and outputs, disaggregated prefill and decode on Dynamo TRT-LLM; the 125 tokens/s figures are SemiAnalysis’s interpolation between measured points. Costs use SemiAnalysis’s TCO of $2.21 per GPU-hour for GB200 NVL72 and $1.95 for B200. ↩

  40. Artificial Analysis, LLM Leaderboard, accessed 9 November 2026. Five-day average output speed, including time to first token: Claude Opus 5.5 at 114 tokens a second, Gemini 3.1 Pro Preview at 109 and GPT-6.1 Terra at 74. Figures change daily. ↩

  41. Nvidia, Inside the NVIDIA Vera Rubin Platform, 2026; Moonshot AI, Kimi K3 configuration, 2026; Activant Analysis, 2026. Rubin: 288 GB of HBM per GPU, 90% usable, 22 TB/s. Kimi K3 at 8-bit (2.78 TB of weights), 184 blocking exchanges per token, attention weights split over eight GPUs; generation only, with enough users to fill memory. Each wait is held at 2 µs per exchange inside a rack and 5 µs across racks, at any domain size. If re-reading weights takes a share f of the memory time left after latency, cost per token rises by 1 ÷ (1 − f), so 25% extra cost allows f = 20%. On one rack each GPU re-reads 42.6 GB of weights per token, which at 20% of a step takes 9.7 ms at 22 TB/s; adding 184 × 2 µs = 0.4 ms of waits gives 1 ÷ 10.1 ms ≈ 99 tokens a second. These assumptions differ from the memory model above, which sizes a K3 copy at 25 tokens a second with 80,000 tokens of context, experts at 4-bit and no latency term. ↩

  42. SemiAnalysis, InferenceX benchmark data, accessed 20 October 2026; Activant Analysis, 2026. In practice, latency per exchange rises with domain size, because traffic crosses more switch hops and software has to coordinate more processors. In the benchmark at note 9, GB200 NVL72 spreading DeepSeek R1 across 32 GPUs gained nothing over B200 servers capped at eight at 250 tokens a second per user, the speed at which latency rather than memory sets the pace. Our model’s latency is fitted to 22 of these runs (median error 4.5% in time per output token), few of which span more than eight GPUs, so holding it flat at hundreds of processors assumes network and software improvements that have not yet been demonstrated. ↩

  43. IT Brief, Marvell Targets AI Connectivity Bottleneck with Nvidia Boost, 2026; Semtech, CopperEdge Signal Integrity Technology, accessed 2026. Murphy’s remarks as reported; the reach figures are vendor statements, not a standard. ↩

  44. Open Compute Project, Cheval Group Open Rack V3 NVIDIA MGX Rack for GB200 NVL72, accessed 2026; Activant Analysis, 2026: 8 racks × 600 mm ≈ 4.8 m, before gaps or cable routing. ↩

  45. SemiAnalysis, AWS Trainium3 Deep Dive, 2025; Amazon Web Services, Announcing Amazon EC2 Trn3 UltraServers for Faster, Lower-Cost Generative AI Training, 2025. The cross-rack bandwidth share is SemiAnalysis’s figure, not Amazon’s. ↩

  46. AMD, AMD Helios: AI Rack Built on Meta’s 2025 OCP Design, 2025; AMD, AMD Helios, 2026; Activant Analysis, 2026: 260 TB/s aggregate scale-up bandwidth ÷ 72 GPUs ≈ 3.6 TB/s per GPU. ↩

  47. The Next Web, Nvidia’s Kyber AI Rack Slips to 2028, and One Circuit Board Is to Blame, 2026; Tom’s Hardware, Nvidia’s Kyber Rack for Rubin Ultra Reportedly Delayed to 2028, Stopgap Solution Also Axed Due to Customer Pushback, 2026. Both report a SemiAnalysis post on X; Nvidia has not confirmed the cancellation. ↩

  48. igor’sLAB, Nvidia Kyber Wavers: When a 78-Layer PCB Slows Down the AI Rack of the Future, 2026; Tom’s Hardware, Nvidia’s Kyber Rack for Rubin Ultra Reportedly Delayed to 2028, Stopgap Solution Also Axed Due to Customer Pushback, 2026. Both report SemiAnalysis; Nvidia’s only response was “Our roadmap is intact.” ↩

  49. Norman P. Jouppi et al., TPU v4: An Optically Reconfigurable Supercomputer for Machine Learning with Hardware Support for Embeddings, ISCA, 2023. Google-authored; the cost share covers the optical circuit switches and the underlying optical components. ↩

  50. Amin Vahdat and Mark Lohmeyer, Google Cloud, Announcing Ironwood TPUs General Availability and New Axion VMs to Power the Age of Inference, 2025; Pankaj Makhija, Google, TPU Rack Overview, Hot Chips 2025 tutorial, 2025. ↩

  51. Nvidia, NVIDIA Vera Rubin POD: Seven Chips, Five Rack-Scale Systems, One AI Supercomputer, 2026. Roadmap designs, not volume deployments. ↩

  52. Nvidia, NVIDIA Announces Strategic Partnership With Lumentum to Develop State-of-the-Art Optics Technology, 2026. ↩

  53. Nvidia, NVIDIA and Coherent Announce Strategic Partnership to Develop Optics Technology to Scale Next-Generation Data Center Architecture, 2026. ↩

  54. Norman P. Jouppi et al., TPU v4: An Optically Reconfigurable Supercomputer for Machine Learning with Hardware Support for Embeddings, ISCA, 2023. Google-authored; the cost share covers the optical circuit switches and the underlying optical components. ↩

  55. SemiAnalysis, Nvidia: The Inference Kingdom Expands, 2026. The TCO judgement refers to the GB200 NVL576 design with pluggable optics; its prototype, “Polyphe”, is for low-volume testing. ↩

  56. Norman P. Jouppi et al., TPU v4: An Optically Reconfigurable Supercomputer for Machine Learning with Hardware Support for Embeddings, ISCA, 2023. Google-authored; the cost share covers the optical circuit switches and the underlying optical components. ↩

  57. Credo, ECOC 2026 Market Focus Presentation, 2026, slide 4. Vendor estimates at 1.6 Tb/s; power varies by signal-processing architecture. ↩

  58. Broadcom, Broadcom Showcases Industry-Leading Quality and Reliability of Co-Packaged Optics, 2025. Vendor-reported results from Meta’s lab testing; the million hours are cumulative 400G-equivalent port-hours, not continuous or fleet operation. ↩

  59. Nvidia, NVIDIA Vera Rubin Ramps Into Full Production to Power Agentic AI Factories Worldwide, 2026. ↩

  60. CNBC, Nvidia’s Latest AI Chip Will Cost More Than $30,000, CEO Says, 2024. Jensen Huang’s estimate in interview; Nvidia publishes no list price. ↩

  61. Nvidia, GTC 2025 Keynote, 2025; transcript per Rev. Jensen Huang on a pluggable transceiver: “this is 30 watts… if you buy in high volume, it’s a thousand dollars.” ↩

  62. Huawei, Huawei Launches the World’s First NPO-based SuperPoD, the Atlas 960E SuperPoD, 2026. Vendor claims, not independent evidence of deployment. ↩

  63. KrASIA, Huawei Brings Near-Packaged Optics to AI with Atlas 960E Superpod, 2026; Huawei Central, Here’s When Huawei Atlas 960E, World’s First NPO SuperPoD, Will Be Available, 2026; Activant Analysis, 2026: 550 kW saved ÷ 48,000 modules replaced ≈ 11.5 W per module. Vendor figures, not independently verified. ↩

  64. Youxi Lin (Huawei), Beyond 1000 Lanes: What Optical Architecture Will Enable the Next Generation of Ethernet Switch?, ECOC 2026 market-focus talk, slide 10: “The pluggable solutions will still be dominant in 224G/L era.” ↩

  65. Wiwynn, Ayar Labs and GUC, Wiwynn, Ayar Labs and GUC Advance Co-Packaged Optics with Live Demonstration of Integrated Optical Compute System at OCP Global Summit 2026, 2026; Ayar Labs, TeraPHY Optical I/O Chiplet, 2026. ↩

  66. CScale, CScale Exits Stealth, 2026; Stephen Nellis, Reuters, CScale Raises $145 Million for AI Networking with Backing from Nvidia and Intel, 2026. Syndicated copy of the Reuters report; the on-chip laser design is from Reuters. ↩

  67. Nick Harris, Scale-Up Is a Problem Made for Photonics, 2026; Nick Harris, Seeing Is Believing: A Technical Deep Dive into Lightmatter’s Hardware, 2025. ↩

  68. Marvell, Marvell to Acquire Celestial AI, Accelerating Scale-up Connectivity for Next-Generation Data Centers, 2025. ↩

  69. Marvell, Marvell to Acquire Celestial AI, Accelerating Scale-up Connectivity for Next-Generation Data Centers, 2025. ↩

  70. Marvell, Marvell Completes Acquisition of Celestial AI, 2026. The $500 million annualized run-rate target is for Q4 of fiscal 2028, the quarter ending January 2028. ↩

  71. Lumilens, Lumilens Emerges from Stealth with More Than $900 Million in Funding to Break AI’s Connectivity Bottlenecks in the Data Center, 2026; Lumilens, Next-Gen Manufacturing, 2026. Company claims. ↩

  72. Reuters, Trump Administration Drafting Ban on Chinese Data Center Devices, Sources Say, 2026. ↩

  73. Broadcom, Broadcom Announces Tomahawk 6 – Davisson, the Industry’s First 102.4-Tbps Ethernet Switch with Co-Packaged Optics, 2025. ↩

  74. Ashkan Seyedi, Nvidia, How Industry Collaboration Fosters NVIDIA Co-Packaged Optics, 2025. ↩

  75. AMD, AMD Acquires Enosemi to Accelerate Co-Packaged Optics Innovation, 2025. ↩

  76. Open CPX MSA, Open CPX Specification 1.0: Co-Packaged and Near-Package Connector and Optics Module, 2026. ↩

  77. CScale, CScale Exits Stealth, 2026; Stephen Nellis, Reuters, CScale Raises $145 Million for AI Networking with Backing from Nvidia and Intel, 2026. Syndicated copy of the Reuters report; the on-chip laser design is from Reuters. ↩

  78. Photonics Online, Scintil Photonics Raises $58M to Scale Integrated Photonics for AI Factories, 2025; Tower Semiconductor and Scintil Photonics, Tower Semiconductor and Scintil Photonics Announce Availability of World’s First Heterogeneously Integrated DWDM Lasers for AI Infrastructure, 2026. ↩

  79. Coherent, Q4 fiscal 2026 earnings call, 12 August 2026, via MarketBeat transcript, 2026. Third-party transcript. ↩

  80. Lumentum, Q3 fiscal 2026 earnings call, 5 May 2026, via MarketBeat transcript, 2026. Third-party transcript. ↩

  81. Nvidia, NVIDIA Announces Strategic Partnership With Lumentum to Develop State-of-the-Art Optics Technology, 2026. ↩

  82. Nvidia, NVIDIA and Coherent Announce Strategic Partnership to Develop Optics Technology to Scale Next-Generation Data Center Architecture, 2026. ↩

  83. Lumentum, Lumentum to Demonstrate DWDM ELSFP Laser Module for OCI MSA Applications at ECOC 2026, 2026. ↩

  84. Tower Semiconductor and Coherent, Tower Semiconductor and Coherent Demonstrate 400Gbps/lane Data Transmission with a Silicon Modulator, 2026; Coherent, Coherent Showcases Optical Innovations to Scale AI Infrastructure at ECOC 2026, 2026. Vendor demonstrations, not products; Coherent’s lasers are differential EMLs. ↩

  85. Renesas, HXT45430 112Gb/s PAM4 Silicon Photonic Modulator Driver, accessed 2026 (output up to 4.0 Vppd; product now obsolete); Ynot Photonics, The DSP Picks the Modulator, 2026 (industry blog, not a vendor specification). Both figures are driver output swing, not a modulator’s half-wave voltage (Vπ), so comparisons with Vπ are indicative. ↩

  86. HyperLight, HyperLight Announces $80 Million Series C to Accelerate TFLN Deployment for AI Infrastructure, 2026 (Business Wire release reposted by Summit Partners); eeNews Europe, 110 GHz Intensity Modulator with Low Half-Wave Voltage, 2025. Vendor claims; no named customer. The low half-wave voltage is for a test-and-measurement modulator; no voltage is published for the 400G-per-lane parts. ↩

  87. Polaris Electro-Optics, Polaris Electro-Optics Secures $50M Series B to Scale Next-Gen Optical Engine Platform for AI Infrastructure, 2026. Company claim; it says the result was independently verified but names neither the verifier nor the test conditions. ↩

  88. Inpho, Products, accessed 2026. Company claims for unreleased products, with no stated test conditions. ↩

  89. Optical Compute Interconnect MSA, Optical Scale-Up Consortium Established to Create an Open Specification for AI Infrastructure, 2026 (founding release, reprinted by TelecomTV); OCI MSA, 2026. ↩

  90. Kaoutar Benyahya et al., Mosaic: Breaking the Optics versus Copper Trade-off with a Wide-and-Slow Architecture and MicroLEDs, SIGCOMM, 2025; Microsoft Research, Breaking the Networking Wall in AI Infrastructure, 2025. Power, reach and reliability are the authors’ claims for a 2 Gb/s-per-channel prototype. ↩

  91. Credo, Credo Unveils 1.6T ZeroFlap Active Light Cable, 2026. Planned shipment date; the initial product is positioned for scale-out and front-end networks. ↩

  92. Lumentum, Lumentum, Qualcomm, and Corning to Demonstrate High-Density 1060 nm VCSEL Optical D2D Connectivity for AI Scale-Up at ECOC 2026, 2026. Proof-of-concept demonstration, not a product. ↩

  93. Avicena, Avicena Ships World’s First 1Tbps Evaluation Kits, 2026. ↩

  94. Ryohei Urata et al., Mission Apollo: Landing Optical Circuit Switching at Datacenter Scale, 2022. Table 1 compares OCS technologies: MEMS to 320×320 at <3 dB; guided-wave (chip-based) 16×16 at <6 dB. ↩

  95. Lumentum, Form 10-K for Fiscal 2026, 2026; Lumentum, Form 10-Q for the Quarter Ended September 26, 2026, 2026. ↩

  96. Coherent, Q1 Fiscal 2026 Earnings Call, 2025 (third-party transcript); Coherent, Optical Circuit Switch, accessed 2026. ↩

  97. Cisco, Cisco 400G QSFP Transceiver Modules Data Sheet, 2026 (400GBASE-DR4: 3 dB maximum insertion loss over 500 m); Gazettabyte, Lumentum’s Optical Circuit Switch for AI Data Centres, 2025. ↩

  98. Ryohei Urata et al., Mission Apollo: Landing Optical Circuit Switching at Datacenter Scale, 2022. Table 1 compares OCS technologies: MEMS to 320×320 at <3 dB; guided-wave (chip-based) 16×16 at <6 dB. ↩

  99. The Next Platform, Salience Labs Wants to Scale Up AI with Silicon Photonics Optical Switch, 2026 (CEO Vaysh Kewada on on-chip amplification; the article reports the 32-port switch “now ramping in production”); Tech.eu, Salience Labs Secures $125M to Scale Photonic Chips for AI Data Centres, 2026. Company claims. ↩

  100. Salience Labs, Product, accessed 2026; Salience Labs, Technology: All-Optical Switching, accessed 2026. Company claims, not independently verified. ↩

  101. nEye.ai, nEye.ai Secures $80 Million Series C to Scale Optical Circuit Switching for AI Infrastructure, 2026. ↩

  102. iPronics, iPronics Raises $125M to Scale Programmable Optical Networking for AI Data Centers, 2026 (release as reprinted by HPCwire). ↩

  103. Gazettabyte, Oriole’s Fast Optical Reconfigurable Network, 2025. Company claims; pitched for scale-out networks. ↩

  104. Molex, Agreement to Acquire Teramount to Accelerate Scalable Co-Packaged Optics Adoption, 2026; Molex, Molex Completes Acquisition of Teramount Ltd., 2026; GlobalFoundries, Light-Speed Ambition: GlobalFoundries Acquires AMF and InfiniLink to Power the AI Datacenter Revolution, 2025; TrendForce, CPO Testing Market Opportunities, 2026; SENKO, Aerotech, Santec, and SENKO Unveil Advanced Active Alignment Architecture for High-Volume Co-Packaged Optics, 2026 (“Each CPO module may require 100+ active alignment operations”; vendor claim). ↩

  105. Arista, Arista Announces Rack-Scale Architectures for Scale-Up and Scale-Out AI Fabrics, 2026. Announced architecture; no shipment date given. ↩

  106. TrendForce, Global AI Server Shipments Forecast to Grow Over 28% YoY in 2026, with a Rising Share of ASIC-Based Systems, 2026. A shipment forecast across all AI workloads, not inference alone. ↩

  107. Andy Jassy, 2025 Letter to Shareholders, Amazon, 2026. ↩

  108. InnoLight 2025 revenue of $5.3 billion from LightCounting, AI Boom Accelerates Transitions Across the Industry Supply Chain, 2026; market of $23.8 billion from LightCounting, Sales of Optical Transceivers Reached $23.8 Billion in 2025, 2026; Activant Analysis, 2026: $5.3 billion ÷ $23.8 billion ≈ 22%. The leader’s figure is total company revenue. ↩

  109. Optical Compute Interconnect MSA, Optical Scale-Up Consortium Established to Create an Open Specification for AI Infrastructure, 2026 (founding release, reprinted by TelecomTV); OCI MSA, 2026. ↩

  110. Open Compute Project, ESUN Network Operator Requirements Base Specification Rev 1.0, 2026; Optical Compute Interconnect MSA, Optical Compute Interconnect, 2026. ↩

  111. Open CPX MSA, Open CPX Specification 1.0: Co-Packaged and Near-Package Connector and Optics Module, 2026. ↩

  112. Marvell, Marvell to Acquire Celestial AI, Accelerating Scale-up Connectivity for Next-Generation Data Centers, 2025. ↩

  113. AMD, AMD Acquires Enosemi to Accelerate Co-Packaged Optics Innovation, 2025. ↩

  114. Norman P. Jouppi et al., TPU v4: An Optically Reconfigurable Supercomputer for Machine Learning with Hardware Support for Embeddings, ISCA, 2023. Google-authored; the cost share covers the optical circuit switches and the underlying optical components. ↩

  115. Broadcom, Broadcom Announces Tomahawk 6 – Davisson, the Industry’s First 102.4-Tbps Ethernet Switch with Co-Packaged Optics, 2025. ↩

  116. Nvidia, NVIDIA Vera Rubin Ramps Into Full Production to Power Agentic AI Factories Worldwide, 2026. ↩

  117. Huawei, Huawei Launches the World’s First NPO-based SuperPoD, the Atlas 960E SuperPoD, 2026. Vendor claims, not independent evidence of deployment. ↩

  118. Nvidia, GTC 2025 Announcements and Live Updates, 2025; Nvidia, Vera Rubin POD: Seven Chips, Five Rack-Scale Systems, One AI Supercomputer, 2026; Alex Woodie, HPCwire, Huang Shares Nvidia Roadmap Showing More Chips, NVL1152, Scale-Up CPO, 2026. Company roadmap targets; the 2028 NVLink 8 CPO date is cited from coverage of the GTC 2026 keynote slide. ↩

  119. Coherent, PhotonLink Launch Presentation, 2026, slide 14. Vendor revenue timing for CPO and NPO scale-up applications, not reported deployment volume. ↩

  120. Marvell, Marvell Completes Acquisition of Celestial AI, 2026. The $500 million annualized run-rate target is for Q4 of fiscal 2028, the quarter ending January 2028. ↩

Disclaimer: The information contained herein is provided for informational purposes only and should not be construed as investment advice. The opinions, views, forecasts, performance, estimates, etc. expressed herein are subject to change without notice. Certain statements contained herein reflect the subjective views and opinions of Activant. Past performance is not indicative of future results. No representation is made that any investment will or is likely to achieve its objectives. All investments involve risk and may result in loss. This newsletter does not constitute an offer to sell or a solicitation of an offer to buy any security. Activant does not provide tax or legal advice and you are encouraged to seek the advice of a tax or legal professional regarding your individual circumstances.

This content may not under any circumstances be relied upon when making a decision to invest in any fund or investment, including those managed by Activant. Certain information contained in here has been obtained from third-party sources, including from portfolio companies of funds managed by Activant. While taken from sources believed to be reliable, Activant has not independently verified such information and makes no representations about the current or enduring accuracy of the information or its appropriateness for a given situation.

Activant does not solicit or make its services available to the public. The content provided herein may include information regarding past and/or present portfolio companies or investments managed by Activant, its affiliates and/or personnel. References to specific companies are for illustrative purposes only and do not necessarily reflect Activant investments. It should not be assumed that investments made in the future will have similar characteristics. Please see "full list of investments" at activantcapital.com/companies/ for a full list of investments. Any portfolio companies discussed herein should not be assumed to have been profitable. Certain information herein constitutes "forward-looking statements." All forward-looking statements represent only the intent and belief of Activant as of the date such statements were made. None of Activant or any of its affiliates (i) assumes any responsibility for the accuracy and completeness of any forward-looking statements or (ii) undertakes any obligation to disseminate any updates or revisions to any forward-looking statement contained herein to reflect any change in their expectation with regard thereto or any change in events, conditions or circumstances on which any such statement is based. Due to various risks and uncertainties, actual events or results may differ materially from those reflected or contemplated in such forward-looking statements.